FAQs
All FAQs
< Previous | Showing 41 to 50 of 69 | Next > | View All on One Page
-
FAQ-29:
In the hourly load data file, for the CCI-GS rate schedule, the Default Energy (MWh) is negative for hours 10-13 on 10/27/2017. Also, for those same hours, in the Unaccounted For Energy (UFE) file, the Total Zone UFE (MW) is positive. Please confirm that the data is correct.
The values provided for the Default Energy (MWh) for the CCI-GS rate schedule and the Total Zone UFE in hours 10-13 on 10/27/2017 should be disregarded due to metering error.
07/30/2024 in Data
-
FAQ-28:
What was the timeline of the Medium Commercial Class transition from default service on a fixed-price basis to default service on an hourly-price basis?
On June 1, 2016, PECO’s non-residential customers with a Peak Load Contribution between 100kW and 500kW, known as the Medium Commercial Class until May 31, 2017, transitioned from default service on a fixed-price basis to default service on an hourly-price basis with energy priced to the PJM day-ahead spot market. Starting June 1, 2017, these customers were merged with PECO’s Large Commercial & Industrial Class, non-residential customers with a Peak Load Contribution greater than 500kW, to form the Consolidated Commercial & Industrial Class (“CCI”). CCI customers will receive default service on an hourly-price basis with energy priced to the PJM day-ahead spot market.
07/30/2024 in General
-
FAQ-27:
Are the Hourly PJM Deration Factors for the PECO Zone provided in Eastern Standard Time or Eastern Prevailing Time?
Hourly reports align with Eastern Prevailing Time. For instance, Hour 1 pertains to the hour between 12:00 a.m. EPT and 1:00 a.m. EPT. Daylight Savings Time (DST) is treated as follows:- Hourly reports spanning the Fall DST period contain 25 consecutive hours.
- Hourly reports spanning the Spring DST period contain 23 consecutive hours.
For more information please see the Data Description document posted to the Data Room.
07/30/2024 in Data
-
FAQ-26:
Is a price on the Bid Form a price for a single tranche? Or does the price associated with the second tranche represent a price offered for two tranches?
Each price on the Bid Form is for a single tranche. A “Bid” is a price in $/MWh for one tranche of a given product.
07/30/2024 in Rules
-
FAQ-25:
Is the hourly load data posted in the Data Room for wholesale energy?
As stated in the data description document, the hourly load data provided in the Data Room on the RFP website includes applicable distribution and transmission losses. These values will be de-rated by PJM for marginal losses prior to energy settlement. PECO provides hourly marginal loss deration factors in the Data Room.
07/30/2024 in Data
-
FAQ-24:
For the remaining Residential Default Load served by PECO, will PECO pay for all of the cost of full requirements service or only the cost of energy and AECs?
In regards to the remaining Default Load, PECO will be a Load Serving Entity in PJM and will acquire all necessary supply through PJM-administered markets and will obtain sufficient Alternative Energy Credits (“AECs”) at market prices to satisfy any near-term obligations under the AEPS Act. Default Suppliers are not responsible for any of the costs related to the portion of the Default Load of the Residential Class served by PECO.
07/30/2024 in Contract
-
FAQ-23:
Where can I find a comprehensive list of historical default service rates for each customer class?
PECO posts a Default Service rate calculation model that translates the prices determined through this RFP into Default Service rates or “Price to Compare” ("PTC") by customer class since 2022. These PTCs are available on the Company website here below the heading 'PTC Archive': https://www.peco.com/MyAccount/MyService/Pages/ElectricPricetoCompare.aspx.
07/30/2024 in Rates
-
FAQ-22:
Are the names of winning RFP Bidders publicly available?
No, the names of winning RFP Bidders are not publicly available.
07/30/2024 in Rules
-
FAQ-21:
When are the solicitation results announced?
Within fifteen (15) days of the close of the solicitation, the Independent Evaluator releases the weighted average price as well as the percentage of load represented by each tranche for each product procured in that solicitation. When the results become available, the Independent Evaluator will make an announcement, and you will be able to access the results here: Background/Previous Results.
07/30/2024 in Rules
-
FAQ-20:
On what volumes are the percentages listed for Alternative Energy Portfolio Standards (“AEPS”) compliance based?
AEPS quantities are based on electric energy sold by an Electric Distribution Company (EDC) or Electric Generation Supplier (EGS) to retail electric customers. AEPS obligations are calculated based on the retail load, which is delivered energy at the retail meter and does not include marginal losses.
07/30/2024 in General
< Previous | Showing 41 to 50 of 69| Next > | View All on One Page